Following a rigorous 2 stage tender and interview process, McGoff Construction emerged as the preferred bidder and more importantly the builder which the entire team wanted to work with, the Architect and the Head-teacher fronted the interview panel. Through early collaboration with the whole Integrated Supply Team (IST), the project went through detailed design and value engineering. The Architects vision was discussed at a series of meetings with the IST and budgets were set for each of the project elements, as the project had funding restraints. All costs were reviewed and subsequently the project was delivered on time and to budget, resulting in maximum benefit for the project stake-holders, particularly the children.